Figure 7From: Information and phase transitions in socio-economic systemsMutual information between the next move in a given position and the position itself. The missing data points in the centre of plot is due to unreliable estimates, see (Harré et al.2011) for details. Reprinted from (Harré et al.2011).Back to article page